Built Twice: How I Was First Raised, Then Replaced Downstream
People who cross me on Highway 39 today are crossing my second self. I stand 94 feet high on the Snake River at river mile 714.7, holding back 1,700,000 acre-feet of water in the largest reservoir of the Bureau of Reclamation's Minidoka Project. I was built to store irrigation water for southern Idaho farms, and I still do that work every day, along with flood control, power generation, fish and wildlife habitat, and recreation. But the dam you see now is not the dam that first rose here.
