Few small towns carry a story like American Falls. The falls on the Snake River were a landmark for the Shoshone-Bannock peoples, for fur traders, and for thousands of Oregon Trail emigrants. A farming town grew up beside them, and then, in the 1920s, the town did something almost unheard of: it picked itself up, buildings and all, and moved to higher ground so a federal dam could flood its original site. The reservoir that covers the old townsite still works for a living, storing irrigation water for southern Idaho, and the grain elevator that refused to move still rises out of the water. This page tells that story in order, from the sources cited throughout.
Last updated: Wednesday, November 18, 2026
πͺΆ The Shoshone-Bannock Homeland
The Shoshone-Bannock Tribes are comprised of the eastern and western bands of the Northern Shoshone and the Bannock, or Northern Paiute, bands, and their ancestral lands encompassed present-day Idaho, Oregon, Nevada, Utah, Wyoming, Montana, and into Canada. The overlapping traditional territories of the Shoshone and Bannock bands ranged over more than half of what is today Idaho and beyond, from the Salmon River in central Idaho south to northern Utah and Nevada and east from Oregon to the Continental Divide. People moved seasonally to fish for salmon, dig camas roots, and hunt, and some bands had adopted horses around 1700 and traveled to the Great Plains to hunt bison.
President Andrew Johnson established the Fort Hall Reservation by Executive Order on June 14, 1867, and the Fort Bridger Treaty of July 3, 1868, affirmed it as the permanent home for the Shoshone and Bannock people while preserving their rights to hunt, fish, and gather in their usual and accustomed places beyond the reservation boundaries. The reservation originally contained about 1.8 million acres and was reduced over time through a survey error, legislation, allotment, and land set aside for the town of Pocatello, railroad rights-of-way, and irrigation networks. It remains the largest reservation in Idaho, at 544,000 acres, and it lies between Pocatello, American Falls, and Blackfoot, with the Snake River, the Blackfoot River, and American Falls Reservoir bordering it on the north and northwest. In March 1869, a few hundred Shoshone-Bannock people were relocated from a Boise refugee camp to the reservation, and the early reservation decades were marked by inadequate federal rations and privation. The reservoir would later reach into this homeland: the proposed American Falls Reservoir extended 25 miles upstream and covered 30,000 acres of Fort Hall Reservation land, for which the reservation received 700,000 dollars, with 100,000 dollars of that going to enlarge and improve the Fort Hall irrigation project.
π Fort Hall and the Oregon Trail
The Wilson Price Hunt exploration party first camped near the falls in 1811, and American Falls thereafter became a stopping point for Oregon Trail emigrants. John C. FrΓ©mont noted in his journal that he camped at "American Falls" in 1843. Nathaniel Jarvis Wyeth built Fort Hall beside the Snake River in 1834, in a key area of northern Shoshone and Bannock activity. The National Park Service calls it the first permanent American trading post between the Rocky Mountains and the Pacific Coast; Wyeth sold it to the Hudson's Bay Company in 1837, the company closed it in 1856, and after 1840 it served as a major supply station on the Oregon Trail.
Thousands of travelers passed through what is now Massacre Rocks State Park after leaving Fort Hall and crossing the Snake River Plain, more than 1,200 miles from Missouri by that point, and Interstate 86 now follows the course of the historic trail through the park. There the wagons had to pass in single file through a narrow gap in the volcanic boulders that emigrants called Devil's Gate or the Gate of Death, a name born of their fear of ambush in the narrow passage. The National Park Service's current account is careful about what happened next: attacks on wagon trains did occur along the Snake River in this era, including fighting a couple of miles east of the rocks in August 1862, but none occurred at the rocks themselves, and the ominous massacre legend was promoted by local tourism boosters in the early 1900s. The name "Massacre Rocks" was bestowed in 1912, decades after the trail era. Nearby, emigrants who camped by Rock Creek and the Snake River carved or painted their names on a great basalt boulder, Register Rock, which was listed on the National Register of Historic Places in 1978 and is preserved today under a protective pavilion. Massacre Rocks itself became a state park in the late 1960s.
ποΈ The First Townsite
Accounts vary on the town's first days, but the Idaho State Historical Society's National Register narrative puts the first sustained habitation around 1880. A ferry was established across the Snake River above the falls in 1881, a post office followed by April 1882, and the Oregon Short Line Railroad chose the river crossing for a head-of-rail construction camp, passing through town in late 1882 and early 1883. By 1884 the town was reported to include a hotel, a livery stable, a store, a depot, and a saloon, and it was platted in 1886. According to the City of American Falls' own history, the town moved across the river in 1888 to what became known as the original townsite, because residents believed the other side had better development potential.
The town on that site grew steadily. By 1906 it had outgrown the original townsite and the Riverside Addition was platted; population was reported at 500 in 1907 and 950 in 1911, and by 1910 wooden cribbed grain elevators, warehouses, and a brick flour mill stood there. On January 30, 1913, Power County was created with American Falls as its county seat, and the county took its name from the early hydroelectric power plant at the falls: the Idaho State Historical Society's county-names reference gives it simply as "Power: For the power plant at American Falls."
π§ Irrigation and the Minidoka Project
The Carey Act of 1894 and the National Reclamation Act of June 17, 1902, brought large-scale irrigation farming to Idaho for the first time, funding public reclamation projects from public-land sales. The Minidoka Project, authorized by the Secretary of the Interior in 1904, was the first Reclamation project constructed in Idaho, and desert land under its proposed canals was opened for settlement in early 1904. Water was turned into the Minidoka canal system in 1907, and in 1910 a pumped system powered by generators at Minidoka Dam supplemented the gravity system; by then 72,000 acres were under gravity irrigation and another 49,000 acres under pumped irrigation in the Minidoka Project alone. By 1918, 240,000 acres were watered by diversions from the Snake River along its 300-mile course through southern Idaho. Then came 1919, the worst drought in Idaho's recorded history to that date: the Twin Falls Canal Company could deliver only 30 percent of its usual water, losses were reported at 25 million dollars, and water managers concluded that the survival of irrigated farming depended on additional storage, a large reservoir to capture spring runoff for late-summer use.
Power came to the falls before the big dam did, and it came from private companies, not from the dam builders. In 1902 the American Falls Water Power Company, on the east shore, and the American Falls Power, Light, and Water Company, on an island, had competing plants at the falls, and a third plant was built on the west shore in 1904 by the Idaho Consolidated Power Company. After the hydroelectric investment bubble burst, the three plants were consolidated under the Southern Idaho Water Power Company, and in 1916 that company was one of five consolidated into the Idaho Power Company. Idaho Power's own summary of the lineage reads: "The original American Falls Power Plant was built in 1902, acquired by Idaho Power in 1916 and rebuilt by the U.S. Bureau of Reclamation in 1927. Idaho Power added a power plant in 1976 when the Bureau again rebuilt the dam."
ποΈ Building the First Dam, 1925β1927
Limited testing of a dam site at American Falls began in 1908, and a thorough geological investigation followed in 1918. In 1919 a dam was proposed that would impound two to three million acre-feet, provide assured storage in drought years, and allow Minidoka-Project-irrigated lands to expand to 250,000 acres; of twelve dam sites available along the Snake River, only American Falls had the capacity to provide adequate storage. The project was formally authorized by the Secretary of the Interior on September 18, 1920, and twenty-one of thirty upper-river irrigation districts subscribed to 700,000 acre-feet of the proposed reservoir. The project nearly died anyway. Reclamation had bought or contracted to buy 93 properties by July 1921, but Idaho Power held a significant portion of the water rights at the falls, and the negotiated deal would reimburse the company one million dollars for those rights while it kept the use of its East Side plant and reservoir water for power generation. In December 1921, Secretary of the Interior Albert Fall ordered the American Falls office closed and the project abandoned.
Local farmers and businesspeople saved it. Secretary Fall agreed to revive the project if Idaho farmers funded half the cost; a vote to form the American Falls Reservoir District succeeded on January 16, 1923, and after an Idaho Supreme Court decision in its favor on July 23, 1924, the District sold 2,700,000 dollars in bonds on September 12, 1924. With local and federal money in hand, the Bureau of Reclamation accepted the Utah Construction Company's bid of 1,936,000 dollars on October 16, 1924. The first dirt was excavated on March 10, 1925, and a cornerstone dedication followed on July 13, 1925, with Secretary of the Interior Herbert Work sealing the stone. The result was a composite concrete and earth gravity dam nearly a mile long. One point deserves emphasis, because it is often gotten wrong: the first American Falls Dam was a U.S. Bureau of Reclamation project of the Minidoka Project, built by the Utah Construction Company. Idaho Power did not build it; its part of the story was the small plants at the natural falls, the water rights Reclamation bought out, and the powerplants it later operated at the dams.
Even the completion date carries two honest answers. The City history and the National Register narrative state that the dam was completed sixty days ahead of schedule on April 21, 1926, that its gates were shut and spring runoff began collecting, that the total cost was 2,850,000 dollars, and that the dam released its first irrigation water on May 2, 1926. The Bureau of Reclamation's current environmental assessment states instead that American Falls Dam was completed in 1927, and Reclamation's own project history says Utah Construction completed the final work in April 1927. The fair reading is that the dam was functionally complete and storing and releasing water in the spring of 1926, with final construction work finishing in 1927, which is why both dates circulate.
π The Great Relocation, 1925β1926
About three-quarters of the town stood where the reservoir would be, and the Bureau of Reclamation purchased 329 properties across the Original Townsite and the Riverside, Union, and Kiers Additions. The National Register narrative counts what moved: 344 residences, 46 businesses, three hotels, one school, six churches, one hospital, six grain elevators, and one flour mill. The new townsite, a 300-acre tract named the Reclamation Addition, held 867 business and residential lots; plans were approved in early September 1923, lot sales began on October 4, 1923, and Reclamation spent 400,000 dollars preparing the ground, laying seven miles of sewer, nine miles of water mains, 12 miles of streets, and eight miles of sidewalks, running power lines to more than 350 homes and businesses, and pouring foundations. The plan radiated from a central town square, with streets angled so each home would have a full measure of the morning sun. The City's history tells it more warmly: the streets were laid out diagonally, residents asked how they would teach their children north or south, and the planners answered that the city was laid out so the sun could shine in every window, a phrase that became the town's nickname.
The moving itself began on January 22, 1925, when Howard Douglas moved the Theil Welding building to the new townsite. Building movers from Ohio and Texas arrived that spring, and a temporary moving road crossed the dam construction area and followed the old Oregon Trail up the hill. Twenty houses had been moved by April 20, 1925, but only 50 buildings by June 11, which drew complaints about the pace. In June 1925 the St. John Lutheran Church was caught on the road on a Sunday, and worshipers attended service while the building was still on wheels, an episode that made national news. The Grand Hotel, the largest building moved that year, took two weeks in late September to reach its present place on the town square. The giant grain elevators went to the new railroad right-of-way in late May 1926, the old railroad depot crossed on the last opening of the moving road on July 13, 1926, and on July 29, 1926, Project Manager F. A. Banks closed the moving road across the dam, officially ending the relocation of American Falls. One structure never moved: the Oneida Milling and Elevator Company's concrete grain elevator, with a 40-foot-deep foundation and 106-foot reinforced concrete walls, could not be moved economically, so it was left in place, and its top still rises above the reservoir today. It was placed on the National Register of Historic Places in 1993. The town still celebrates the move every early August at American Falls Day; in 2024 the Chamber of Commerce counted 99 years since the move, and in 2025 the community counted 100.
π The Reservoir and What It Changed
Behind the dam spread a reservoir of about 1.7 million acre-feet, the largest reservoir of the Minidoka Project, lying in Power County and stretching northeast into Bingham and Bannock Counties. It covered the submerged remains of the pre-1925 town, its foundations, sidewalks, and building depressions spread across 1,460 acres of the old additions, visible only during low-water years, and it also inundated sections of Aberdeen, Springfield, and Sterling, in addition to nearly three-quarters of American Falls. The natural falls the town was named for were lost beneath it. The Oregon Short Line's main line crossed at American Falls and miles of its track would have flooded, so the railroad bridge was raised 22 feet at a cost of 250,000 dollars, the railroad was paid for its old right-of-way and property, and it built a new depot in the Reclamation Addition. On the Fort Hall Reservation, 30,000 acres were flooded, compensated at 700,000 dollars.
The water went to work immediately. Reclamation's 1994 resource plan states that the reservoir supplies water downstream for the irrigation of about 700,000 acres within the Minidoka Project, and that the project as a whole supplies irrigation water for over 1,150,000 acres in southeastern Idaho in conjunction with the other Upper Snake reservoirs. The National Register narrative puts it plainly: the reservoir to this day provides the irrigation water storage necessary to supply southern Idaho's agricultural economy. Its benefits today are multipurpose, covering irrigation, power generation through the Idaho Power plant, flood control, fish and wildlife resources, and recreation, and its pool swings with the farm year, from a full pool of about 1.7 million acre-feet in April to essentially empty in October.
π§ A New Dam, 1973β1978
The first dam did not age well. A core-drilling program in the early 1960s revealed that the concrete in portions of it was in a relatively advanced stage of deterioration, caused by a chemical reaction between alkalis in the cement and the aggregate, and the resulting loss of strength forced a fill restriction that cut reservoir storage to about 66 percent of maximum design capacity. By an act of Congress on December 28, 1973, the American Falls Reservoir District, acting as the constructing agency for the storage spaceholders, was authorized to finance and contract for the dam's replacement. In 1976 Idaho Power built the current hydroelectric powerplant at the dam, with three generators that Reclamation gives a FERC-authorized output of 92.4 megawatts. That same year the upstream Teton Dam failed during filling, and operators opened the gates at American Falls amid fears that the flood surge could cause the deteriorating dam to fail. The new dam was built downstream of the old one between 1976 and 1978; construction was completed in 1978, the original structure was demolished, Reclamation repaid the District, acquired title, and assumed responsibility for operations and maintenance. Today the Bureau of Reclamation operates the dam and reservoir as part of the Minidoka Project and controls reservoir releases and headwater levels, while Idaho Power owns and operates the powerplant, a concrete gravity dam standing on river mile 714.7 of the Snake River.
π‘ American Falls Today
American Falls remains the county seat of Power County, with a population of 4,568 at the 2020 census, in a county of 7,878. The City describes itself as a small, multicultural Idaho city of modest historical homes, moved to its present site by the 1925 damming of the Snake River, and a state conservation plan describes it as the urban and commercial center of its district and an agricultural community on the reservoir. The past is still visible everywhere: the flooded old townsite's foundations and sidewalks emerge in low-water years, the Oneida grain elevator still rises from the reservoir, Massacre Rocks State Park and Register Rock preserve the Oregon Trail corridor about 10 to 12 miles southwest, and American Falls Day each early August marks the anniversary of the move. For the full documentary record behind this page, see the Idaho State Historical Society's National Register nomination for the American Falls Reservoir Flooded Townsite and the City of American Falls history page.